DP Tecnical with English Subtitles
- Descrição
- Currículo
- Revisões
01. Presentation
02. Methodology
03. Industrial Introduction and Basic History
-
8DP History
Features important historical milestones in the timeline from 1961 to the present day.
-
9Quiz - DP History
-
10DP Stakeholders 1
Understanding of the people and institutions involved in the dynamic positioning system, their degree of influence in the industry and regulatory body.
-
11Quiz - DP Stakeholders
04. Basic Concepts of DP Vessel Types
-
12DP Installations
Basic overview of the different operations DP operations, maritime and offshore support.
-
13Quiz - DP Installations
-
14DP System Communication
- Generic description of the networking system;
- Serial interface type;
- Analog signal;
- Digital signal;
- Field stations.
-
15Quiz - DP System Communication
-
16DP Principles
-
17Quiz - DP Principles
-
18DP Redundancy and Class- Definition of Redundancy
Definition of redundancy;
DP classes; DP 1, DP 2 and DP 3.
05. Configuration Concepts for Different Types of DP Vessels
06. Control System Inputs
-
21Sensors
- Gyro;
- MRU;
- Wind sensor;
- Draft sensor;
- Tension sensor.
-
22Quiz - Sensors
-
23PRS Processing Data
- Origin PRS;
- PRS fault detection tests:
- Freeze test;
- Variance test;
- Prediction test;
- Divergence test;
- Average test.
-
24Quiz - PRS Processing Data
-
25PRS-GNSS
- Positioning Satellite Constellations;
- GNSS - Global Navigation Satellite System;
- Differential Correction;
- Differential Services;
- Ionospheric Scintillation;
- Drive off x Drift off.
-
26Quiz - PRS GNSS
-
27Local PRS
- Taut wire;
- Laser;
- Microwave;
- Microwave FMCW;
- DARPS;
- HPR.
-
28Quiz - Local PRS
-
29Inertial System
- INS
- HAIN
-
30Quiz - Inertial System
07. Power System
-
31Power System
- Power System and its Components;
- PMS-Power Management System;
- Advantages and Disadvantages of open and closed Bus;
- Spinning Book;
- What are the protections of the electric bus used for;
- UPS – Uninterruptable Power Supply
- Power overload control in the DP block diagram;
- Blackout recovery.
-
32Quiz - Power System
08. Software Functions
09. Thruster System
10. DP Components and Software Function
-
37Design, FMEA and Consequence Analysis
- Performance, Protection and Detection;
- WCF (worst case failure);
- WCFDI (worst case failure design intended);
- FMEA (failure mode effect & analysis);
- All DP trials (FMEA proving trials, endurance trials, annual trials, mobilization trials, post incident trials, DP post modification trials);
- Consequence analysis.
-
38Quiz - Design, FMEA and Consequence Analysis
-
39Auxiliary Systems
- Auxiliary systems: (fuel system, lubricating oil, fresh water, salt water, compressed air, air conditioning (HVAC) and ventilation);
- Redundancy of active components for DP 2;
- Redundancy of active and static components for DP 3;
- Fault tolerance;
-
40Safety Systems
- Security System & Possible Design flaws that could degrade the DP system. (f&g system, fixed fire extinguishing system, ESD, QCVS);
- ESD 0 design flaw, which may compromise the results of ESD0 triggering (for robust DP systems).
-
41Quiz - Auxiliary System
11. Operational Risk Analysis
12. Human Factor
13. Assessment
14. Course Evaluation
Please, login to leave a review